DESCRIPTION OF WORK: The work hereafter referred to requires the complete construction and start-up necessary for the Norwood Young America Water Treatment Facility with all necessary equipment generally described, but not limited to the following paragraphs.
A. Induced draft aeration, concrete detention and filter tanks, pumping facilities and clearwell. B. Washwater reclamation and pumping facilities. C. Site preparation, finish grading, seeding, sodding at construction site. D. Furnishing and installation of yard piping and connections for raw watermain, finished watermain, and sanitary sewer. E. Maintain operation of existing water treatment, supply and distribution systems at all times.
Bolton & Menk, Inc.
|
|
|