Plan Overview
Issues Map
Goals & Objectives
Public Meetings
Draft Transportation Plan
Related Project Links
Project Contacts
Comments/Public Input
Transportation Plan

Draft Transportation Plan
The City’s Draft Transportation Plan Update is substantially complete and ready for public review and comment. Updates are anticipated daily as the Transportation Advisory Committee’s comments are addressed.
Last Update 07/25/08.
1.0....Purpose of the Transportation Plan(24 KB PDF)
1.1 Transportation Issues
1.2 Transportation Goals and Objectives
1.3 Relationship to Other Planning Documents
2.1...... Transportation Modes and Trip Types
2.2...... Roadway Functional Classification and Jurisdiction
2.3...... Non-Motorized Transportation Systems
2.4...... Corridor Design Guidelines
2.5...... Transit
2.6...... Aviation
2.7...... Rail
2.8...... Pavement Management
3.1.......Transportation System Connectivity and Service Routes
3.2...... Existing Traffic Volumes and Capacity
3.3...... Safety Analysis
3.4...... Pavement Conditions
3.5...... Regional Transportation Initiatives
4.1...... Future Corridor Connections and Service Routes
4.2...... Forecasted Traffic Volumes
4.3...... Pavement Management Needs
4.4...... Roadway Jurisdiction
5.1...... Connectivity, Capacity, and Safety Priorities
5.2...... Modal Integration Priorities
5.3...... Development Driven Priorities
5.4...... Regional Transportation Initiatives
5.5...... Education and Enforcement
5.6...... Potential Funding Sources
| Tables | |
| Table 2.1-1 | Transportation Modes and Trip Types |
| Table 2.4-1 | Design Vehicle and Design Speed Guidelines |
| Table 2.4-2 | Street Types by Roadway Functional Classification |
| Table 2.4.4-1 | Levels of Intersection Control Options |
| Table 2.4.4-2 | Traffic Circle Diameter Versus Corner Radius |
| Table 2.4.4-3 | Intersection Control Types by Roadway |
| Table 2.4.5-1 | Roadway Types and Capacity |
| Table 2.4.5-2 | Highway Levels of Service |
| Table 2.4.5-3 | Urban Street Level of Service |
| Table 2.4.6-1 | Roadway Access Standards |
| Table 2.4.6-2 | Access Spacing Guidelines for Collector Roadways in Northfield |
| Table 3.3-1 | Crash Severity |
| Table 4.2.1-1 | Comparison of Non-Motorized Transportation Modes by City |
| Table 5.0-1 | 2008 Planning Level Cost Estimates |
| Figures | |
| Figure 2.2-1 | Existing Roadway Functional Classification (1.1 MB) |
| Figure 3.1-1 | Existing Transportation Issues Map (860 KB) |
| Figure 3.2-1 | Existing Volume and Congestion (1.2 MB) |
| Figure 3.3-1 | 1997-2006 Crashes Involving Pedestrians or Bicycles (14.1 MB) |
| Figure 3.3-2 | |
| Figure 4.1-1 | Future Functional Classification (1.1 MB) |
| Figure 4.1-2 | Existing and Future Transit Services (1.8 MB) |
| Figure 4.2-1 | Transportation Analysis Zones (1.4 MB) |
| Figure 4.2-2 | 2030 Volume and Congestion - No Bridge (1.1 MB) |
| Figure 4.2-3 | 2030 Volume and Congestion - Jefferson Parkway Bridge (1.1 MB) |
| Figure 4.2-4 | 2030 Volume and Congestion - CSAH 1 Bridge (1.1 MB) |
| Figure 4.3-1 | Intersection Control Evaluation Needs (912 KB) |
| Appendices | |
| Appendix A | Crosswalk Installation Policies and Guidelines (192 KB) |
| Appendix B | Use and Application Guidelines for the Residential All-Way Stop Control Justification Worksheet (44 KB) |
| Appendix C | Stakeholder and Open House Meeting Summaries (164 KB) |
| Appendix D | Existing and Forecasted Traffic Volumes and Capacity Analysis (No Bridge Option, Jefferson Parkway Bridge Option and CSAH 1 Bridge Option) (112 KB) |
| Appendix E | Transportation Analysis Zone Forecasts |