Location
City of Myrtle Beach, South Carolina
Solutions
Sectors
This large-scale drainage improvement and ocean outfall project is approximately 90 acres in size in a highly developed section of Myrtle Beach with 100 percent runoff. Bolton & Menk was responsible for the on-shore and off-shore designs for this project which included the installation of two 84-inch pipes with a capacity around 525 cfs extending 1,200 linear feet into the Atlantic Ocean.

Named one of the very best workplaces in the State of Minnesota! We’re proud to rank in the Top 50 on the list, and even prouder that we were voted in by our own employees.