25th Avenue South Ocean Outfall, City of Myrtle Beach, South Carolina

25th Avenue South Ocean Outfall

This was the very first large-scale drainage improvement system project for the City of Myrtle Beach. The Yaupon Drainage Basin includes approximately 189 acres of commercial and residential land uses. Bolton & Menk provided the design services to convey the stormwater runoff beyond the beach, piping it offshore 1,200 feet in the Atlantic Ocean. In addition, several large underground junction boxes were included in the design to create water quality improvements before the stormwater is released into the Atlantic Ocean.

Related Projects

G23_532 BMI - Top Workplace Award_Email Signature

Named one of the very best workplaces in the State of Minnesota! We’re proud to rank in the Top 50 on the list, and even prouder that we were voted in by our own employees.