
TH 30 Utility Improvements, City of Pipestone, Minnesota
Bolton & Menk worked with the city and other entities to find a real solution
Home / Lullwater Off-Shore Outfall, City of Panama City Beach, Florida
The City of Panama City Beach experienced a large amount of upstream flooding and beach erosion in recent years from Hurricane Sally and other large storm events.
The City of Panama City Beach experienced a large amount of upstream flooding and beach erosion in recent years from Hurricane Sally and other large storm events. The Lullwater Offshore Outfall project included the modeling of a 935+/- acre coastal drainage basin for the various storm events and determining the tidal influence on the drainage basin with a type III 100-year storm event. The design consists of a dual 84-inch culvert pipe to be placed 1,500 linear feet offshore into the Gulf of Mexico under the seafloor. The proposed culvert is designed to handle the 100-year event of more than 500 cfs. The design also includes several upstream BMPs to reduce pollutant loading from entering the Gulf of Mexico.
Bolton & Menk worked with the city and other entities to find a real solution
The project realized a $10 million savings from the original budget due to many of
Airpark West is conveniently located off of I-85, within close proximity to the Charlotte-Douglas International
The design solution increased the outfall storm sewer capacity in the flood vulnerable area southeast
Named one of the very best workplaces in the states of Minnesota, Iowa, North Carolina, and South Carolina! We’re proud to rank in the Top 50 on the list, and even prouder that we were voted in by our own employees.