
Water Treatment Plant Reclaim Improvements, City of Mankato, Minnesota
The amount of water saved is equivalent to the daily use of 5,000 residents.
Home / Baihly Summit Drive Water Tower Telecommunications Equipment Reinstallation, Rochester Public Utilities, Minnesota
Proper reinstallation of the telecommunications equipment was an essential variable to ensure the new protective coatings were maintained.
Rochester Public Utilities (RPU) completed an elevated storage tank rehabilitation on the Baihly Street tower. The rehabilitation included construction of a tower roof structure to support multiple telecommunication carriers' equipment. Due to new protective coatings, reinstallation of the telecommunications equipment required close monitoring to ensure the new coatings remained intact. Following RPU protocol, Bolton & Menk reviewed construction drawings, made the necessary recommendations, and observed installations. Final installation observations were provided, which included work performed by the contractor. Additionally, necessary coating repairs were closely monitored to ensure satisfactory application procedures.

The amount of water saved is equivalent to the daily use of 5,000 residents.

A temporary Class A biosolids treatment was designed and procured for the city for interim

Recommended improvements were constructed in phases, allowing the plant to remain in service during the

The new lift station was constructed south of the existing station and installed while the