Home / Runway 11/29 and 18/36 Pavement Rehabilitation, City of Worthington, Minnesota
The project saved the city from costly pavement repairs.
The existing bituminous pavement on Runway 11/29 was last rehabilitated in 2007. Since that time the existing cracks had widened, the longitudinal joints have deteriorated, and the surface aggregate began to be exposed. The bituminous pavement on Runway 18/36 was constructed in 2007. Since that time no pavement rehabilitation had been completed.
For Runway 11/29, the project involved crack repair, patching of the transverse pavement joints, two part crack repair for wider cracks, and application of an asphalt seal coat. For Runway 18/36, the project involved crack repair, two part crack repair for wider cracks, and application of an asphalt seal coat.
The pavement life for Runway 11/29 and 18/36 is now extended, thus saving the city from costly pavement repairs.

Using the full-depth reclamation process saved the City of Hutchinson a substantial amount of money.

Bolton & Menk worked with the FAA to reconfigure the taxiways so taxilanes in both

The funding involved creative financing through borrowing federal non-primary entitlement funds, MnDOT matching funds, and

To minimize the length of time the airport was without an operational instrument approach, proper