
Clear Lake Water Quality Project, City of Forest Lake, Minnesota
Over the course of this project, Bolton & Menk developed a trusting partnership with those
Home / Storm Sewer Master Plan and InfoSWMM Modeling, City of Fargo, North Dakota
The master plan identified a framework for regional storm sewer construction, lift station construction, and surface flood storage areas.
The City of Fargo is planning to develop property bounded by 57th Street North, 45th Street North, and the railroad extending through the Horse Park property. Development is anticipated to extend to the north extraterritorial boundary between Reile’s Acres and the City of Fargo. Therefore, trunk storm sewer sizing and preliminary lift station analysis were required to determine the level of infrastructure needed to accommodate initial development plans and future needs.
The City of Fargo’s Storm Sewer Master Plan analyzed existing drainage conditions and proposed stormwater management systems under a variety of development scenarios using Innovyze InfoSWMM hydraulic modeling software. Several development scenarios were analyzed to detail the required storm sewer, lift station, and surface storage requirements.
The master plan identified a framework for regional storm sewer construction, lift station construction, and surface flood storage areas. It also guided the city in determining critical infrastructure needs for a large development in its final stages of approval. Future roadway needs were analyzed in conjunction with the trunk storm sewer project to ensure construction phasing was carefully considered.

Over the course of this project, Bolton & Menk developed a trusting partnership with those

Bolton & Menk listened to their request for deicer guidance at their fingertips and led

The construction of an onsite stormwater capture and reuse system, and the development of integrated

A new detailed hydraulics model of the dam was built which included not only the