Wastewater Nutrient Removal at Storm Lake Pork Processing Plant, Tyson Foods
The design services included a large-scale pilot study of chemical phosphorus removal and evaluation of
Home / Wastewater Treatment Improvements, City of Marshall, Minnesota
The pretreatment facilities successfully achieved the reduction in CBOD and TSS parameters required by the city’s wastewater treatment facility.
The City of Marshall has used Bolton & Menk as their trusted wastewater consultant for 20 years. Throughout that time, we have studied and developed many projects for the city’s wastewater treatment facility. In addition, we have assisted with NPDES permitting, effluent toxicity testing, and development of wastewater rates.
Bolton & Menk completed a facility plan for the city in 2017. The first phase of construction recommended as part of that plan was implemented in 2019-2021. This significant design upgrade for the wastewater treatment facility consisted of upgrading the aeration system blowers with a demand-based control system, construction of an additional final clarifier, and biosolids handling upgrades including storage, pumping, gravity thickening, and mixing to help the city more cost effectively manage their biosolids program. Also, with this project the facility motor control centers and supervisory control and data acquisition (SCADA) system was upgraded. The City of Marshall produces a Class A biosolids from their ATAD treatment system, also designed by Bolton & Menk. Our team is currently assisting the city with lift station upgrades and ongoing operational and permitting issues.

The design services included a large-scale pilot study of chemical phosphorus removal and evaluation of

This project has been a huge investment in our community’s infrastructure, and updates an essential

The project completely renovated and modernized our municipal treatment infrastructure, while laying the groundwork to

“For most communities in the Upper Midwest, home water softeners are the primary source of