
NC 152 Highway Corridor Study, Town of China Grove, North Carolina
Bolton & Menk is designing a transformative vision for NC 152 in China Grove, addressing
Home / TH 4 in St. James, MnDOT District 7
By presenting factual information in a non-technical format and persistently conveying consistent messages, support was built for the mini-roundabout intersections.
TH 4 through St. James was in a state of disrepair. The city utility infrastructure was also in poor condition, experiencing multiple breaks annually. Bolton & Menk completed final design services for the reconstruction of this 1.6-mile project that included narrowing the corridor, replacing two traffic signals with two mini-roundabouts, implementing back-in angle parking, and preparing plans for aesthetic improvements in the downtown.
The project was led with an informed-consent approach to address design and public perception challenges. Public support for removal of traffic signals that have operated in a town for decades can be challenging. Print materials, tutorial animations, and a public outreach video were produced to tell the story of this project. By presenting factual information in a non-technical format and persistently conveying consistent messages, support was built for the mini-roundabout intersections.
One challenge was working with downtown businesses to identify coal chutes, areaways, window wells, and other underground structures along the project. We produced specific plan details that showed proper removal or protection of the structures, which minimized the risk to MnDOT and the business owner.

Bolton & Menk is designing a transformative vision for NC 152 in China Grove, addressing

Raising the road above the 100-year flood elevation allows for continuous operation of the highway

The Gull River Crossing project delivers a safer, more efficient connection with a modern roadway,

Through 3D video and other tools, proposed changes were communicated and helped stakeholders visualize what