International Drive, Horry County, South Carolina
A major obstacle to development of this roadway was the requirement to protect the black
Home / 25th Avenue South Ocean Outfall, City of Myrtle Beach, South Carolina
This was the very first large-scale drainage improvement system project for the City of Myrtle Beach.
This was the very first large-scale drainage improvement system project for the City of Myrtle Beach. The Yaupon Drainage Basin includes approximately 189 acres of commercial and residential land uses. Bolton & Menk provided the design services to convey the stormwater runoff beyond the beach, piping it offshore 1,200 feet in the Atlantic Ocean. In addition, several large underground junction boxes were included in the design to create water quality improvements before the stormwater is released into the Atlantic Ocean.

A major obstacle to development of this roadway was the requirement to protect the black

Airpark West is conveniently located off of I-85, within close proximity to the Charlotte-Douglas International

The project realized a $10 million savings from the original budget due to many of

The first phase of the project, which included design of 468 lots, 3 sewage pump