
24th Avenue North Ocean Outfall, City of Myrtle Beach, South Carolina
Bolton & Menk provided the preliminary drainage studies and associated reports pertaining to this 156-acre
Home / 25th Avenue South Ocean Outfall, City of Myrtle Beach, South Carolina
This was the very first large-scale drainage improvement system project for the City of Myrtle Beach.
This was the very first large-scale drainage improvement system project for the City of Myrtle Beach. The Yaupon Drainage Basin includes approximately 189 acres of commercial and residential land uses. Bolton & Menk provided the design services to convey the stormwater runoff beyond the beach, piping it offshore 1,200 feet in the Atlantic Ocean. In addition, several large underground junction boxes were included in the design to create water quality improvements before the stormwater is released into the Atlantic Ocean.

Bolton & Menk provided the preliminary drainage studies and associated reports pertaining to this 156-acre

These new pedestrian and bicycle facilities along Cedar Lake Road will serve as a safe

Bolton & Menk, Inc. worked as a true partner to the Campus throughout the design

LULU's is a new waterfront restaurant located in the new Dockside Village. The restaurant includes