
Industrial Park Road and Highway 175 Improvements, City of Ellsworth, Iowa
Our design aligned the industrial road with a new access to an existing gas station
Home / South Conway Phase 2A Gas Line, Dominion Energy
The existing 6-inch steel gas line initially installed in the 1960s was replaced with a new 12-inch steel gas main to serve Myrtle Beach.
The existing 6-inch steel gas line that served Myrtle Beach was initially installed in the 1960s. Bolton & Menk was retained by SCE&G, now Dominion Energy, to study and recommend route options for the installation of a new 12-inch steel gas main to replace the 6-inch steel gas line. The route we recommended depicts Hemingway Chapel Road to the Waccamaw River along the Santee Cooper power line to Pitch Landing Road in Conway for a distance of 3.8± miles. We provided surveying and civil engineering design services to permit and construct the project. We were on-site during the pipe installation to capture the pipeline data for the installation of the new gas main which crossed Liz Lane, Pitch Landing Road, and Copperhead Road by jack and bore below the roadway surface from right-of-way to right-of-way.

Our design aligned the industrial road with a new access to an existing gas station

Approximately 21,000 SF of existing space was renovated, and 52,000 SF was added to provide

The University Avenue improvements provide a more pedestrian and business friendly roadway.

Travelers of CSAH 4 can now rest easy knowing their commutes are and will continue