Home / SE Utility and Street Improvements, City of Wadena, Minnesota
Successful funding applications resulted in improved current and future infrastructure capacity throughout the city's southeast area.
The southeast portion of Wadena was experiencing poor infrastructure conditions and inadequate traffic capacity. Bolton & Menk prepared extensive preliminary survey and evaluated existing sanitary sewer, watermain, storm sewer utility, and transportation infrastructure for condition and capacity to meet future demands. Approximately 16,000 feet of sanitary sewer, 16,000 feet of watermain, and 5,000 feet of storm sewer was reconstructed, in addition to stormwater treatment basin construction and 35 blocks of residential and commercial street reconstruction. The project included the redesignation of CSAH 50 and CR 103 within the city. Successful funding applications resulted in $500,000 from the Local Road Improvement Program, $1 million of CWRF Green Project Reserve Stormwater Grant, and $2.3 million in state aid and county funding. The city received a 1 percent interest rate loan from the Public Facilities Authority to fund the remaining cost and improve its current and future capacity throughout the southeast area.

Stewart Creek and a portion of the future Stewart Creek Greenway are located adjacent to

The existing 6-inch steel gas line initially installed in the 1960s was replaced with a

The master plan includes four championship golf courses with two clubhouses, a 120-acre Town Center

A pavement analysis looked at pavement type, subbase material, and long-term maintenance costs to help