
Bridgewater Community, Bay Tree SC, LLC
This project is a redevelopment of the Baytree golf courses into a large-scale mixed-use residential
Home / Lullwater Off-Shore Outfall, City of Panama City Beach, Florida
The City of Panama City Beach experienced a large amount of upstream flooding and beach erosion in recent years from Hurricane Sally and other large storm events.
The City of Panama City Beach experienced a large amount of upstream flooding and beach erosion in recent years from Hurricane Sally and other large storm events. The Lullwater Offshore Outfall project included the modeling of a 935+/- acre coastal drainage basin for the various storm events and determining the tidal influence on the drainage basin with a type III 100-year storm event. The design consists of a dual 84-inch culvert pipe to be placed 1,500 linear feet offshore into the Gulf of Mexico under the seafloor. The proposed culvert is designed to handle the 100-year event of more than 500 cfs. The design also includes several upstream BMPs to reduce pollutant loading from entering the Gulf of Mexico.

This project is a redevelopment of the Baytree golf courses into a large-scale mixed-use residential

A pavement analysis looked at pavement type, subbase material, and long-term maintenance costs to help

The facility includes a 200,000-square-foot distribution center and 35,000 square feet of office space, and

A large drainage study recommended a series of improvements to help reduce localized flooding.