
High Trestle Trail Connection, City of Perry, Iowa
The trail created a regional passion to complete the remainder of the connection through the
Home / Waterbridge, South Carolina Coastal Development. I, Inc.
The first phase of the project, which included design of 468 lots, 3 sewage pump stations, bridges, and a 60-acre lake, was completed in just 54 days.
Bolton & Menk is the engineer of record for this project which is located on a 675-acre tract in the Carolina Forest region of Horry County. Bolton & Menk provided surveying, planning, design, regulatory approvals, construction observation, and contract administration. We planned the project with a 60-acre lake as the main visual amenity. The tract was encumbered by approximately 150 acres of wetlands which were avoided entirely with the exception for a few road crossings—all permitted under the USACE Nationwide Permit Program. In addition, we planned and designed the clubhouse and pool complex that has the largest swimming pool amenity in the Carolinas. The project has nearly 1,300 single-family lots. Bolton & Menk is particularly proud of the design of Phase 1. We completed the design of this 468-lot phase, including 3 sewage pump stations, bridges, and the 60-acre lake in just 54 days! The client had deadlines that were critical to their sales efforts, and we stepped up to ensure those deadlines were met. Their sales force sold every lot in the first phase over two weekends.

The trail created a regional passion to complete the remainder of the connection through the

Approximately 21,000 SF of existing space was renovated, and 52,000 SF was added to provide

Bolton & Menk provided the preliminary drainage studies and associated reports pertaining to this 156-acre