Arts and Innovation District, City of Myrtle Beach, South Carolina
The streetscape included realigning and redesigning roadways to include wider sidewalks, on-street parallel parking, and
Home / South Conway Phase 2A Gas Line, Dominion Energy
The existing 6-inch steel gas line initially installed in the 1960s was replaced with a new 12-inch steel gas main to serve Myrtle Beach.
The existing 6-inch steel gas line that served Myrtle Beach was initially installed in the 1960s. Bolton & Menk was retained by SCE&G, now Dominion Energy, to study and recommend route options for the installation of a new 12-inch steel gas main to replace the 6-inch steel gas line. The route we recommended depicts Hemingway Chapel Road to the Waccamaw River along the Santee Cooper power line to Pitch Landing Road in Conway for a distance of 3.8± miles. We provided surveying and civil engineering design services to permit and construct the project. We were on-site during the pipe installation to capture the pipeline data for the installation of the new gas main which crossed Liz Lane, Pitch Landing Road, and Copperhead Road by jack and bore below the roadway surface from right-of-way to right-of-way.

The streetscape included realigning and redesigning roadways to include wider sidewalks, on-street parallel parking, and

Working with Main Street businesses, we designed a downtown revitalization project that considered heavy vehicular

This project involved the planning, modeling, final design, and regulatory approvals for a triplex 18,000

This critical link in Brooklyn Center’s sewer system required bypass pumping to keep sewage flowing