
Bump-out Improvements, City of Des Moines, Iowa
The bump-outs along the corridor improve intersection safety for both pedestrians and motorists, while enhanced
Home / Barefoot Landing, Sam Puglia
LULU's is a new waterfront restaurant located in the new Dockside Village. The restaurant includes an outdoor seating area with a bar, a store, and an arcade.
Bolton & Menk is the engineer of record for this award winning, innovative, and highly successful project that is surrounded by an approximate 24-acre lake swarming with fish, turtles, and alligators. New to Barefoot Landing is Dockside Village. Bolton & Menk provided civil design services to expand the 5.4-acre area of the overall existing project with placement of 2.6 acres of fill for the main pond for the relocation and improvements of existing roads and to provide additional buildable uplands for an expansion of commercial facilities and parking. LULU's is a new waterfront restaurant located in the new Dockside Village. The restaurant includes an outdoor seating area with a bar, a store, and an arcade. We provided surveying, civil engineering, landscape design, and construction services.

The bump-outs along the corridor improve intersection safety for both pedestrians and motorists, while enhanced

Alternative excavation means, including trenchless water services, were incorporated to help the contractor cross the

A large drainage study recommended a series of improvements to help reduce localized flooding.

The existing 6-inch steel gas line initially installed in the 1960s was replaced with a