
555 Mangum, Van Alen Property Owners, LLC
The site includes a 400-unit, mixed-use development with associated driveways, sidewalks, streetscape, utilities, stormwater, parking,
Home / CATO Headquarters and Distribution Center, LS3P Associates
The facility includes a 200,000-square-foot distribution center and 35,000 square feet of office space, and a parking area with 150 tractor trailer spaces and 125 employee spaces.
Bolton & Menk has worked with Cato Corporation, a leading specialty retailer of value-priced women's apparel, since 2008. We led the planning, landscape architecture, and civil engineering services for the phased design and construction of Cato's Charlotte, North Carolina distribution center. The center serves more than 1,000 stores in 31 states.
The building includes a 200,000-square-foot distribution facility and 35,000 square feet of office and administrative space. Parking includes 150 tractor trailer spaces and 125 employee spaces. Bolton & Menk also managed the permitting process. Stormwater best management practices include the engineering of a wet pond and sand filter. Innovative stormwater techniques were used to maximize the buildable site area.

The site includes a 400-unit, mixed-use development with associated driveways, sidewalks, streetscape, utilities, stormwater, parking,

Our design aligned the industrial road with a new access to an existing gas station

110 East is a 23-story, 370,000 square-foot LEED Gold and WiredScore Platinum-certified office tower in

Duck Lake Road needed critical infrastructure upgrades including wider lanes, pedestrian facilities, improved stormwater management,