Results 41-50 of 953 for [ ]
This complex project had an aggressive schedule that required full oversight, testing, and verification services to ensure project objectives were met.
The TH 24 and Hemlock Intersection Improvements project solved a decade-long problem and facilitated an economic expansion within the City of Annandale. TH 24 became more than just a roadway, it became an extension of the city’s ...
Today, German Park features a state-of-the-art, structurally sound, concrete terraced amphitheater space that has expanded audience capacity to more than 550 patrons.
We have received positive feedback from Greater Minnesota MnDOT districts who value the need to look at mobility differently, using new data available and in a quantifiable manner.
The pretreatment facilities successfully achieved the reduction in CBOD and TSS parameters required by the city's wastewater treatment facility.
The BRT concept designs will function as a solid reference point for conversations with project partners and the public about what is and is not possible from an engineering perspective throughout the corridor.
Increasing traffic and safety needs prompted a reconstruction project on 18th Avenue NW in northwest Rochester.
The overarching goal for this plan is to serve as a comprehensive, usable document, to better cater to the growing and evolving recreational needs of the community.
The new water treatment facility is successful in removing radium from the drinking water.
Local children now have a fun space to cool off in the hot summer months.