
Waterline Interconnection, Grand Strand Water & Sewer Authority
This project involved the planning, modeling, final design, and regulatory approvals for a triplex 18,000
Home / Barefoot Landing, Sam Puglia
LULU's is a new waterfront restaurant located in the new Dockside Village. The restaurant includes an outdoor seating area with a bar, a store, and an arcade.
Bolton & Menk is the engineer of record for this award winning, innovative, and highly successful project that is surrounded by an approximate 24-acre lake swarming with fish, turtles, and alligators. New to Barefoot Landing is Dockside Village. Bolton & Menk provided civil design services to expand the 5.4-acre area of the overall existing project with placement of 2.6 acres of fill for the main pond for the relocation and improvements of existing roads and to provide additional buildable uplands for an expansion of commercial facilities and parking. LULU's is a new waterfront restaurant located in the new Dockside Village. The restaurant includes an outdoor seating area with a bar, a store, and an arcade. We provided surveying, civil engineering, landscape design, and construction services.
This project involved the planning, modeling, final design, and regulatory approvals for a triplex 18,000
The project consisted of on-shore and off-shore design of a single 84-inch diameter gravity feed
The existing Hillside Drive roadway was raised 3 to 4 feet above existing grade to
The trail created a regional passion to complete the remainder of the connection through the
Named one of the very best workplaces in the states of Minnesota, Iowa, North Carolina, and South Carolina! We’re proud to rank in the Top 50 on the list, and even prouder that we were voted in by our own employees.