Home / Downtown Riverfront Improvements, City of Fergus Falls, Minnesota
"The Downtown Riverfront revitalization is a significant undertaking that happens to be located in the heart of our great community. Although the project itself is complex and an inconvenience during construction, Bolton & Menk’s staff consistently communicates with the adjacent business owners. It is a valuable aspect to our business community for them to have the ability to maintain operations in a safe manner during construction. Open communication with our residents and businesses is the city’s top priority during the revitalization project(s). Bolton & Menk has and continues to demonstrate positive community interaction not only in the project design phase but as well, during actual construction."
- Brian Yavarow, City Engineer
Early in 2018, Fergus Falls adopted a Downtown and Riverfront Master Plan aimed at uncovering economic and recreational opportunities along the Ottertail River corridor. Bolton & Menk was enlisted to guide the city through the planning process.
By 2021, with the final master plan and funding in place, Bolton & Menk developed design documents for a segment of the downtown riverfront. The proposed enhancements included a versatile river market structure, regional bike and pedestrian improvements, infrastructure upgrades, and public spaces like a splash pad, all shaped by community feedback gathered through meetings, events, surveys, and social media.
With these plans finalized, the city pursued and obtained funding to progress with phase 1 construction in 2022, which included the market structure, parking lot improvements, bike trail extension, river overlook, monumentation, and gathering spaces. Phase 2 was completed in 2024 with additional features like a splash pad, interactive river feature, public art, shade structures, multiple gathering spaces, and a public restroom building.
Because of the innovative planning, engineering, and landscape architecture, the city has a beautiful downtown riverfront area that attracts users from across the region.

The park prominently features a multi-generational ninja warrior course – the first park of its

The project redeveloped the site in two phases. The existing retail and office space was

Windsor Heights is reimagining Colby Park as a vibrant, all-ages destination with iconic play spaces,

Canary Park resides within a growing neighborhood in Clive, is adjacent the city’s trail network,
Three Bolton & Menk projects received accolades from the City Engineers Association of Minnesota (CEAM) in both
Two Bolton & Menk projects have received Project of the Year Awards from the Minnesota